Julabo Chiller Work Scope: 1. Overhaul the unit. 2. Replace the AC motor, pump and Pressure Transducers 3. Temp Set – 10 ~ 30 degree 4. Perform Functional Test on the Chiller (closed loop) with continuous running for at least 2 days.