Affinity Chiller – Single Loop Work Scope: 1. Overhauling of motor, impeller head replacement. 2. Fixing the leak on copper Tubing 3. Compressor overhauling, Solenoid valve 4. Perform Functional Test on the Chiller (“with Load Test”) with continuous running for at least 2 days. 5. Temp set point – 15 ~ 17 degrees